A file we simulate wrong is the most valuable thing you can send us.
Confirmed issues get fixed, added to our regression tests, and credited in the
changelog. Check
what’s simulated and what falls back, then
include the file (or a stripped-down snippet that shows the problem) with your report.
Feedback
Help shape UltraNC
Suggest features, report bugs, and vote for what matters most. The most-wanted ideas rise to the top and feed our roadmap.
-
Peck drilling
Peck drilling times seem much longer than my actual cycle times. Here is the test code I used. (T1 D=5.0 - 5MM DRILL) G21 G90 G17 G94 G54 T1 M6 S2000 M3 G0 X0 …
-
Dwell not working
Broken, no delay
-
M06 - Tool Change
How is tool change time allowed for in calculating cycle time?